Every job below is a real Long Island home. Real systems, real scope, real timelines. Suffolk and Nassau, brick cesspools through I/A advanced septic.
Featured projects
A selection of recent jobs across Suffolk and Nassau. Project photos added as homeowners approve them.

I/A Hydro-Action AN-500 in Babylon
Failing 1958 brick cesspool replaced with SCDHS-approved I/A advanced septic, full SCSIP grant approved

Precast Replacement in Smithtown
Collapsed 1970s cesspool, rebuilt with new precast tank, distribution box, and 8-ft leaching pool

Emergency Pump-Out in Massapequa
2 a.m. backup call, full pump-out, baffle inspection, riser added to grade

Drain Field Rebuild in Huntington
Failed leach field replaced with two-pool gravity system, original tank kept

I/A Norweco Singulair in Bay Shore
South-shore wellhead zone, full I/A install with SCSIP grant covering $28,400 of $34,000

Real-Estate Inspection in Patchogue
Sludge probe, baffle inspection, drain-field load test, written report for closing attorney

Cesspool Conversion in Riverhead
Old single-chamber cesspool converted to two-tank septic with new leaching field

Restaurant Grease Trap in Hauppauge
Quarterly recurring contract, NYSDEC manifest provided, Health Dept compliant
Latest check-ins from the trucks
Live feed pulled from our route logs. Real towns, real systems, last 30 days.
Routine 1,500-gallon cesspool pump-out for a colonial homeowner. Sludge depth 32 inches, pH normal. Riser to grade installed last year — pump-out completed in 35 minutes.
Cesspool replacement on a 1962 ranch. Removed collapsed brick pool, installed two 8x6 precast concrete leaching pools with distribution box. SCDHS permit pulled and closed in 14 days.
Emergency Sunday call for a backed-up tank in a finished basement. Truck on site in 80 minutes. Pumped 1,200 gallons, scoped the line, identified a partial root intrusion at the inlet.
I/A OWTS new install with full SCSIP grant. Hydro-Action AN-500 nitrogen-reducing system. Saved homeowner $28,000 of the $34,200 project cost via Suffolk County grant program.
Septic inspection for real estate transfer. Sludge depth measured, baffles checked, lid integrity photographed. Written report to buyer attorney within 18 hours.
Drain field repair after recurring backups. Added a third leaching pool and rebuilt distribution box. Yard restored, sod replaced, no more standing water.
New cesspool install for a home addition. Pulled SCDHS permit, set 8x6 precast pool, tied into existing line. Backfilled and finish-graded within four days.
Restaurant grease trap cleaning. 750-gallon outdoor unit pumped, screen cleaned, NYSDEC manifest left on file. Added to quarterly route.
Cesspool replacement for a south-shore canal home. High water table required dewatering and shoring. Two precast leaching pools installed with riser to grade.
Annual maintenance pump-out for a rental property. 1,000-gallon tank, sludge depth 28 inches. Photo-documented for property manager records.
Septic inspection and dye test for refinance. Bank required documentation of system integrity. Passed with notes recommending pump-out within 12 months.
Cesspool repair: replaced sunken cast iron lid with new precast cover, rebuilt the inlet baffle. Same-day repair, no excavation needed.
2100+ completed jobs across Suffolk and Nassau since 2004.
Read what homeowners saidWant a quote for your house?
Schedule a free site visit. We will locate your tank, check sludge, and send a written quote within 48 hours.
or fill out the form, it takes 20 seconds
Schedule a walk-through
Five fields. We take it from there.